Skills To Help You Rehab a Home
Basic Water Pipe Repair Many of the foreclosed homes that I encounter have sat over the winter and the cold weather has burst water pipes in the basement and walls. Usually the hardest part of the repair is finding all the leaks. You do this by turning on the water, listening for falling water, then visually inspecting where the water is coming from. Once you find the leak, cut out the old section of pipe and cut a section of new pipe to replace it. Rough up the end of the old and new sections of pipe with your sandpaper. Apply flux to each section of pipe and to a coupler that will be used to join the pieces. Put the new section in place. Heat the coupler with your butane torch and apply solder around the edges of the coupler. The flux will melt creating a vacuum inside the coupler and drawing the solder inside. Once it is sealed all the way around, allow the solder to dry and move on to the next leak. If you are worried about using a butane torch on this project, ask your hardware professional about Shark-Bite fixtures.
Drain Repair Clogged drains are a very common problem. When a working drain gets clogged, Draino or a quick snake will often do the trick. If that doesn't work, unscrew the drainpipe and inspected for clogs. In a vacant house, a clog can become impenetrable. If you encounter such a clog, you need to cut it out and replace that section of drain. Once the clog is cut out, cut a similar length of PVC pipe to replace it. Either connect the new pipe to the old with PVC connectors or with a fernco connector. If you use the PVC connectors make sure that you clean the old pipe thoroughly and apply PVC cement to ensure a proper seal. Many plumbers apply pvc cement or pipe dope even if the pieces they are putting together are threaded.
Replacing Light Fixtures Remove the old fixture by unscrewing the wire nuts or by cutting the wires. Strip off a section of the wire casing and attach you new fixture with wire nuts. Be sure to tape off any exposed wire with electrical tape. Since each fixture will come with its own set of instructions, be sure to read those instructions thoroughly to insure proper installation. Electricity can cause severe injury if you do not follow instruction implicitly. You should always use an amplitude meter to insure that power is off to the fixture to avoid electrocution.
Window Installation Carefully remove the old window, making sure not to damage the wood frame. Once the window is removed place wood shims on the sill and level the shims. Once the shims are level secure them in place with screws (drilling pilot holes will keep the shims from splitting). Put the new window in place. At the sash, place more wood shims between the wood frame and the window to fill that gap, and then secure the shims in place by screwing through the window frame and into the wood frame. Repeat this step about six inches from the top and six inches from the bottom of the sides. Once the sides are secure, make sure you can easily open and close the window. Fill the gaps around the window with expanding foam insulation.
Refinishing Wood Floors Almost every house I buy has stained, smelly tattered carpet covering stained hardwood floors. Rather than re-carpet the floors, I like to refinish the hardwood. First remove the old carpet. Then remove all of the tack strips, staples, nails and quarter round molding. Once the floor is clean, run your drum sander with the grain of the wood. Make sure that you get a thorough explanation from the rental yard on the operation of the drum sander and that you understand it completely before you begin this project. Working a drum sander is a lot like working a self-propelled lawn mower. It is very important that you keep the drum sander moving at all times though. If you leave it sit it will quickly eat into the floor. I start with 36-grit sandpaper, then 80-grit, and then 100-grit. Once the main body of the floor is sanded, do the edges with an edge sander using the same grits of sandpaper that you used on the main floor. When all the sanding is complete, sweep the floor, and then vacuum the floor. After vacuuming, I suggest a damp mopping. Once the floor is dry apply your choice of stain, Allow to dry then coat with 2 - 3 layers of polyurethane. Replace the molding.
Laying Tile The key to a good tile project is a good foundation. Whether you are tiling a wall or floor, the foundation must be plumb or level and the surface must be flat. Start by removing the old coverings whenever possible. Once the old covering has been removed put down a cement backer board over the entire area to be tiled. Be sure to secure the backer board with screws designed for this application. Fill in the joints of the backer board with mortar. Begin tile installation by troweling on a thin application of mastic over a three to four foot area. Set the tile in place and push gently to secure the position. Place a spacer next to the tile and position the next piece. Continue in this fashion until the tiles are all in place. Allow the mastic to dry for 24-hours before grouting. If you are laying a natural stone tile (travertine, slate, marble) be sure to seal the tile prior to grouting. If you don't, the tile will appear hazy. Remove all tile spacers. Mix the grout and push the grout into the seams using a rubber float. Immediately wipe up excess grout with a damp sponge. After an hour or so, wipe down the tile with a paper towel or piece of cheesecloth to get rid of the haze on the surface.
Texturing a Ceiling To get a perfectly textured ceiling, dip a paint roller with a long (4 foot) handle into a bucket of top-coating mud. Roll the mud onto the ceiling. Push your texturing brush into the mud and pull back quickly to create a random dimple pattern all across your ceiling. After it dries finish by painting with a white ceiling paint or a color to complement your walls.
Painting a Room Be sure to prep the wall surface prior to painting. Do this by applying a thin coat of spackle to any pin holes or cracks, then sand to a smooth finish. Next, apply one coat of latex primer to the surface of the walls using a roller. After the primer dries apply your paint. Two coats of a flat paint will generally provide complete coverage. To edge the walls, apply painter's tape to the trim, and brush the paint onto the edges. After you have painted the edges, remove the painter's tape and you're done.
Landscaping The exterior is the first impression people will get of your house. Take time to remove all the overgrown 1950's era plants and replace them with smaller more modern looking plants. After removing the old shrubs, cultivate the bed and mix in organic materials like manure, compost or peat moss. The exterior is the first impression people will get of your house. Most of the time, I remove all the overgrown 1950's era plants and replace them. If there are any good plants in the landscape, I try to remove them in a way that they can be re-used in the landscape. If they are too large to remove, prune them to improve their appearance. After removing the old shrubs, cultivate the bed and mix in organic materials like manure, compost or peat moss. Arrange your new plants on top of the beds. Once you are happy with the arrangement, remove any burlap or plastic and plant them. Be sure not to bury the root balls of shrubs. You want to plant the shrub with just a little of the ball showing above the ground
About the Author:
You like it? Share it!
